Most of the obvious changes this week were a little hard to take a picture of without the good camera (aka the camera with a flash). The air conditioning ducts are in place which is very important since we hope to open mid summer.
The view of the whole building from the front.
Detailed tilework view in the columns of the entrance
The preparation for the tilework on the back of the building, which will be the same as the tile at the main entrance once that's put in place.
Two photos showing the southwest corner of the building. The crane is there to put up the awning that will be over the drive-through window.
The program room for adults
The computer lab from one corner where the windows will be.